| Notched Trowel Size | Coverage | Size of Tiles |
|---|---|---|
| 6MM | 2-3 KG/M² | Small |
| 8MM | 3-4 KG/M² | Medium |
| 10MM | 5-7 KG/M² | Large |
| Tensile Adhesion | |
| a. Dry Condition | 2.30 N/mm² |
| b. Wet Condition | 1.90 N/mm² |
| Shear Adhesion | |
| a. Dry Condition | 2.40 N/mm² |
| b. Wet Condition | 1.90 N/mm² |
| c. Heat Ageing Condition | 2.10 N/mm² |
| Other Properties | |
| Open Time | 45 Mins. |
| Adjustment Time | 45 Mins. |
| Pot Life (at 23°C) | 60 Mins. |
| Traffic Time | After 24 Hrs. |
Enter your project area & select bed thickness (6mm / 8mm / 10mm) to estimate how many 40 KG bags you need.
Standard: 40 KG Bag (Total: 200 KG)
*Note: Coverage is based on standard technical mortar density. Actual consumption may vary marginally based on substrate levelness and notched trowel angle.
Ensure the surface and AAC/ACC blocks are clean, structurally sound, and free of dust, dirt, oil, or any loose particles. Lightly dampen the blocks with water before application.
Gradually add the 40 KG powder to clean water. Mix manually or with a slow-speed stirrer to achieve a smooth, lump-free paste. Let the mixture rest for 5-10 minutes, then remix before use. (Pot life is approx. 120 minutes).
Spread the adhesive uniformly on the block surface using a suitable notched trowel. A 5mm notched trowel is recommended for optimum coverage (2-3 KG/M²). The maximum thickness of the adhesive can be up to 5MM to 10MM as per requirement.
Place the blocks firmly into the wet adhesive and check the alignment. Tap gently with a rubber mallet to ensure 100% contact and eliminate air pockets. Complete the fixing within the 20-minute open time.
The product is self-curing. Clean any excess adhesive from the joints immediately with a damp sponge. Allow at least 24 hours for proper setting before proceeding with further construction (Traffic Time).